Finally I figured out how much the metro stations will be built in the central nucleus of "Moscow City". It opened today only "Exhibition". It will soon be added two more. Plot Kalinin-Solntsevo line from the station "Business Center" to "Victory Park" is part of a promising line that will include acting Kalinin (yellow) line and runs from the station "Tretyakov" through the "Moscow City" in areas Solntsevo and Novo -Peredelkino.

Station "Business Center" will be an interchange to the existing station "Exhibition", and in the future also be cross-platform assembly together with the homonymous station of the Third interchange circuit. That is, the station "Business Center" will have two platforms on two different branches of the metro. Total in the City will be three stations, plus a number of "international". The first platform "Business Center" is planned to open before the New Year, the second platform - in 2015.

New metro station in the

Platforms "Exhibition" stations and two stations "Business Center" were erected in structures even during construction of the central nucleus of "Moscow City" in 1999-2004. Externally underground "Business Center" will be almost an exact replica of the nearby station "Exhibition".

New metro station in the

station "Business Center" located in the lower two levels of the underground space of the kernel. On the "yellow" branch is already under way finishing work is carried out laying of utilities, installation of the ventilation system, the top structure of the device path, as well as the commissioning of escalators.

New metro station in the New metro station in the New metro station in the

In order not to block the traffic on the territory of the "City", the installation of two tunnel boring machine 100 meters long managed to carry through the chamber length and a width of eight meters. The photograph shows the towering skeleton of a skyscraper.

New metro station in the

The two tunnel boring machine were launched from the station "Business Center" in the direction of "Victory Park". One of them was almost 2,400 meters and will be released soon in the dismantling chamber.

New metro station in the

As in "Exhibition" on the new stations will be used vibroput - a unique design that almost completely absorbs the noise and vibration from passing staff. At spring (gray cylinder) is installed a metallic frame which is filled with concrete. In the end it turned out that the composition of the plate will go on hanging almost in the air springs, which suppresses all vibration and vibration at the complex itself. This is in order to minimize the negative impact of passing trains on the skyscrapers.

New metro station in the

Here is the finished board vibroputi.

New metro station in the

Welder Lasiev Amirali.

New metro station in the New metro station in the

Operating length of the line section from station "Business Center" to "Victory Park" will be 2.38 km, while messages from the station "Business Center" to "Victory Park" will be 2.5 minutes, while total turnover of 15 minutes.

New metro station in the New metro station in the New metro station in the

The first step in entering the line-up provides shuttle train was only left-tunnels.

New metro station in the

The second tunnel is planned to start in late 2014. In 2015, the stage of "Business Center" - "Victory Park" will connect with the existing Kalinin line, there will be three new stations in the ring, "Plyushchikha", "Volkhonka" and "Kutuzov Prospect". Further new diametrical line will go to the west and will connect the "Moscow City" with areas Dorogomilovsky, Ramenky, Ochakovo and Solntsevo Novoperedelkino.

New metro station in the

The ventilation system.

New metro station in the New metro station in the

Pay attention to the marks on the wall

New metro station in the New metro station in the New metro station in the

Installation of escalators.

New metro station in the

Construction at the time the subway forever!

New metro station in the